| Work Accomplished
| Payments
September 4, 2025
- Addressed complaints from 1337 homeowners concerning front yards
- Ran water to locate all oversprays
- Installed filters in all sprinklers requiring adjustment and adjusted to prevent parked cars from being sprayed.
- $50 to GWPC for 2 hours. Check 2397
August 28, 2025
- Tested east commons area zones and sprinklers.
August 27, 2025
- Performed manual ACC Controller test of all 42 irrigation zones. Test results as follows:
- Only 10 zones can be controlled from ACC Controller: 5-7,11-12,17,19,22-24
- 6 zones showed no response to commands: 8-10,18,20-21
- 1 zone showed no signs of receiving commands and is obviously disconnected: 10
- 23 zones went into "Alarm Mode" and were immediately shut down by the controller: 1-3,13-15,25-41
- Learned there is no zone 4 or 16, and zone 12is controlling both 1317 and 1325 backyards.
- Zone 42 removed from system during stormwater remediation effort.
- There are only 39 zones.
- Main control panel reset to control only the 10 known good zones.
- Rewired 3 decoders and solenoids.
| August 16, 2025
|
- Approved $4500 at the 8/16/25 BOD meeting for the purchase of local timers, concrete bags, and batteries to overcome ACC controller issues.
August 13, 2025
- Adjusted sprinkler at 1283E to water entire front, and trimmed bush to allow so.
- Dug grass away from 1283D rotator and adjusted.
- Replaced broken rotator at 1283H.
- Replaced broken pop-up at 1283I. Had to dig up head from around roots.
- Adjusted 1337F front sprinklers.
- Adjusted 1337H rear sprinklers.
- Replaced sprinkler head at 1337G.
- Fixed broken pipe at 1281B.
| June 27, 2025
|
- $375 to Get Wright Property Care for 15 hrs over 6/12, 6/17, 6/23, and 6/24.
June 24, 2025
- Tested Building 1309 & 1329 front sprinklers and flagged damaged heads.
- Uncovered and cleared numerous sprinklers in the front of 1309 & 1329.
- Replaced damaged pop-up at 1309E and adjusted spray.
- Replaced 1309J rotor and adjusted.
- Capped sprinkler at 1309G.
- Replaced sprinkler at 1309G.
- Replaced sprinkler head at 1309H.
- Replaced 1309C rotor and adjusted.
- Tested 1333 front solenoid and detected no leaks.
|
June 23, 2025
- Shut off complex water supply.
- Discoverd 1333 rear solenoid damaged in two places from mowers.
- Dug hole and removed damaged piping.
- Repaired broken piping.
- Replaced solenoid casing and installed new solenoid.
- Rewired solenoid.
- Turned complex water supply back on.
|
June 17, 2025
- Fixed gushing sprinkler at 1341F.
- Capped sprinkler head at 1341B.
- Added rotator and pop-up sprinklers at 1341B. Dug trench and ran new flexhose to rotator.
- Cut grass around numerous sprinkler heads.
- Added filters to 1341A & 1341B sprinklers to control spray.
|
June 12, 2025
- Tested Building 1287 front sprinklers and flagged damaged heads.
- Replaced 1287E rotor and adjusted.
- Used nipples & flexhose parts.
|
June 4, 2025
- Adjusted 1337C sprinkler, along with 5 others at Bldg 1337.
- Adjusted all 1337H sprinklers.
- Adjusted sprinkler at 1325B.
- Cleared grass from ~60 sprinkler heads at Buildings 1315, 1317, 1325, and 1329.
- Adjusted rotator at 1325E.
- Capped piping at 1315F.
- Replaced pop-up at 1329G.
- Dug up sprinkler at 1329H and fixed it.
|
- $300 to GWPC for 6/2 & 6/4.
June 2, 2025
- Replaced 1337C sprinkler with new pop-up.
- Replaced 1309J sprinkler with new pop-up.
- Replaced 1305F rotator and adjusted spray.
- Adjusted sprinkler and replaced 2 rotators along 1st street in east commons.
- Removed unneeded flex pipe and capped line at 1309D.
|
May 30, 2025
- Tested Building 1283 front sprinklers and flagged damaged heads.
- Adjusted a number of sprinkler heads.
- Repaired stuck solenoid.
- Replaced 2 rotators at 1283G.
- Repaired damaged tee fitting at 1289B.
- Organized sprinkler parts in storage shed..
|
- $125 to GWPC for 5/15 & 5/30.
May 15, 2025
- Replaced dirt and planted grass in front common area to address bad erosion.
- Capped unneeded sprinkler at 1309J.
- Dug up unneeded piping by Dumpster 2 and capped line.
|
May 8, 2025
- President programmed the Hunter Controller to activate all sprinkler heads in accordance with the following watering schedule.
|
May 5 & 12, 2025
- Replaced dirt and planted grass in front common area to address bad erosion.
- Capped unneeded sprinkler at 1309J.
- Dug up unneeded piping by Dumpster 2 and capped line.
|
| April 26, 2025
|
- $2500 authorized at BOD meeting.
April 23, 2025
- Dug and found leak in front commons, cutting through bushes and roots.
- Repaired damage with new pressure-fitting coupling.
- $8.49 for parts.
Pre-April 23, 2025
- Blair's Curb Appeal replaced a number of sprinkler heads and performed minor programming of controller. The President let Mr. Blair go due to lack of communication on progress.
- The President has brought back Mr. Kevin Wright (GWPC), the former Meadows South handyman, to perform irrigation system remediation.
- GWPC delivered a detailed report of our irrigation system's status on April 9, 2025), i.e. what is broken and needs to be fixed.
- GWPC is working to remediate our irrigation system and in order to return the sprinkler system to proper function.
|
- $1500 allocated to Blair's Curb Appeal to cap broken sprinkler heads and piping, and to program the Hunter ACC (controller).
- $1000 allocated to Susan Seger to purchase sprinkler heads.
- $100 to GWPC for remediation efforts.
| January 18, 2025
|
- Approved $3600 from the irrigation system reserve fund at the January 18, 2025 annual meeting.
| | | | | | | | | | | | | | |